Hinsdale Select Board reviews hazard mitigation update, draft due in April

HINSDALE — December 13, 2023 — Hinsdale Select Board hears presentation on required five-year hazard mitigation plan update, with a draft due in April 2024. Consultant Jamie Kaplan, a Northampton-based planner working on nearly a dozen similar plans statewide under a Massachusetts Emergency Management Agency contract, told the board that maintaining a FEMA-approved plan is the prerequisite for the town to apply for pre-disaster mitigation funding — and that every dollar spent on mitigation saves at least $6 in future disaster losses. Preliminary flood analysis already identifies 43 single-family homes in the town's flood plain, along with town hall, railroad tracks, and Route 8 as at-risk assets. Select Board member Bob Collins pressed for state agencies — citing the Department of Conservation and Recreation specifically — to take greater responsibility for hazards on state-owned land affecting neighboring properties, including recent first-floor flooding affecting seven homes near the Hinsdale Flats on the Washington town line. A second public meeting is scheduled for February, followed by a draft plan review in March before submission to MEMA.

Keep reading with a 14-day free trial

Subscribe to The Hinsdale MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Hinsdale MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Berkshire County News · The Lanesborough Post · The Lee Post · The Lenox Post · The Monterey Post · The Mount Washington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.